Skip to main content

Posts

Showing posts with the label Material Requirement Planning

The Power of Turbochargers: Boosting Performance and Efficiency

Introduction In the world of internal combustion engines, turbochargers have become a popular method of increasing power and efficiency.  This gas compressor, often referred to simply as a turbo, is a form of forced induction that forces air into the engine, resulting in more power for a given displacement.  In this blog, we will explore the inner workings of turbochargers and their impact on engine performance. The Components of a Turbocharger At its most basic level, a turbocharger consists of three major components: the turbine, the compressor, and the bearing system that supports the turbine shaft connecting the turbine and compressor wheels.  The turbine is located on the hot side of the turbocharger and is bolted onto the engine's exhaust manifold.  As the engine runs, the exhaust gases pass through the turbine, spinning a fan called the turbine wheel. This spinning motion converts heat and pressure into rotational force, which in turn spins the compressor wheel.  The compres

Material Requirement Planning (MRP), Objectives And Terminologies

Material Requirement Planning Material Requirement Planning (MRP) is a strategy for deciding the amount and timing for obtaining of dependant interest things expected to fulfill the expert creation plan prerequisite. MRP is one of the powerful tools that, when applied properly, helps the managers for the achievement of effective manufacturing control. MRP Objectives: 1. Inventory reduction 2. Reduction in manufacturing time 3. Reduction in delivery lead time 4. Realistic delivery commitments 5. Increased efficiency Don't Miss:  Comparison of Manual Car Wash And Automatic Car Wash Different types of engines used in automobile industries Buy Electric Cars And Save Lot of Money: Checkout How to Save Money?   MRP Terminology: 1. MRP: A technique for determining the quantity and timing of dependant demand items. 2. Lot Size: The quantity of items required for an order. 3. Time Phasing: Scheduling to produce or receive an appropriate amount (Lot) of material s
mud flaps